The extent of the runway refurbishment project in 2006. Other projects for that year included interior redesigns of the Moskva and Ladoga bars, an additional waiting room with 72 seats, and replacing passenger elevators.
-
Terminal one of Pulkovo Airport. The airport was originally built with one... -
One of the GOMACO paving trains. The paving train, consists of a PS-2600... -
Paving and curing underway. Paving production averaged 1m a minute, with... -
The repaving project created the only runway in Russia capable of receiving... -
The extent of the runway refurbishment project in 2006. Other projects for...