A study by ANA Aeroportos de Portugal and EUROCONTROL showed that the airport had overly complex ground circulation, two crossing runways (one with operational restrictions), no parallel taxiway running the full length of the runways, high runway occupancy and unsuitable runway exits.


Back to Project Details