The 2.5km Skytrain link runs along the southern edge of the site.
-
Düsseldorf International is the third largest airport in Germany. -
The completed Terminus was completed and opened on 1 July 2001. -
The new terminal building at Düsseldorf International Airport. -
The site is intensively developed along the southern edge. The emerging... -
The main terminal complex houses the Skytrain western terminal at high level,... -
New facilities built to replace those destroyed in 1996 have high levels of... -
The 2.5km Skytrain link runs along the southern edge of the site. -
The project included this terminal incorporating the main line railway... -
With the removal of check-in desks, the station terminal’s facilities are... -
With the acquisition of LTU, the Air Berlin group became the main operator at...